Water Tight Technologies

  RUBBERALL® Family of Products
  RUBBERALL® Membrane Qualities
  Product Specifications & Safety Data Sheets
  Warranty
  Installation Manual
    General Information
    RUBBERALL® User Cautions And Warnings!
    RUBBERALL®Tools Needed
    RUBBERALL® Products Available
    Roof Surface Preparation
    Laying Out RUBBERALL® EPDM Membrane
    Pipe Penetrations
    Protrusion In The Roof
    Adhering Membrane With Solvent Based Bonding Adhesive
    Adhering Membrane With Water Based Bonding Adhesive
    Seaming Membrane Panels With Seam Tape
    Splicing And Seaming With Rubber To Rubber Adhesive
    Alternative Panel Layout And Seaming
    Perimeter Walls & Inside Corners
    Outside Corner Finish Detail
    Cover Strip
    Peel And Stick Pipe Boot
    Pipe Or Conduit Flashings Using Uncured Flashing With Tape
    Wall Termination
    T-Joints
    Field Seam Radical Bend
    Roof Edge Termination With Metal Drip Edge
    Terminating RUBBERALL® On Fascia
    RUBBERALL® Membrane To Shingle Transition
    One Piece Drain Sleeve
    Drains With Clamping Rings
    Pitch Pockets
    Protecting RUBBERALL® Membrane In High Foot Traffic Areas (Decks)
    Repair Of RUBBERALL® Membrane
    Application Review
    Frequently Asked Questions
    Glossary
    RUBBERALL® Roofing Membrane Material And Labor Limited Warranty
    Warranty Registration
  Installation Video Guide
 
see printer-friendly version

Wall Termination

Always extend the membrane up the wall a minimum of twelve inches (12"). When using wood shakes, or other siding materials, a Termination Bar is not required if the siding material is brought down at least eight inches (8") below the top of the EPDM sheet. All siding must be kept a minimum of four inches (4") above the roof deck.

Determine the height of the finished wall flashing (12" height or less if job conditions won't allow for full 12") and the placement of the aluminum RUBBERALL® Termination Bar. Chalk a line at this level. Peel the top of the wall flashing from the wall to chalk line and apply a heavy bead of Water Cut-Off Mastic between the EPDM and wall. The mastic should be applied so that the final position of the Termination Bar will be directly over the Water Cut-Off Mastic.

Fasten the Termination Bar with nylon/metal anchor pins, or aluminum sheet metal screws. Install a fastener in every pre-drilled hole. Remove excess membrane that extends above the Termination Bar and apply Lap Caulk to the top of the Bar.

Figure 23

Termination bar comes in five foot (5') and ten foot (10') lengths.

 
 
Home About RUBBERALL Roofing Products Water Garden Products Contact Us About BRITE-N-EZ BRITE-N-EZ Roofing Products Roof Coatings Site Map