Water Tight Technologies

  RUBBERALL® Family of Products
  RUBBERALL® Membrane Qualities
  Product Specifications & Safety Data Sheets
  Warranty
  Installation Manual
    General Information
    RUBBERALL® User Cautions And Warnings!
    RUBBERALL®Tools Needed
    RUBBERALL® Products Available
    Roof Surface Preparation
    Laying Out RUBBERALL® EPDM Membrane
    Pipe Penetrations
    Protrusion In The Roof
    Adhering Membrane With Solvent Based Bonding Adhesive
    Adhering Membrane With Water Based Bonding Adhesive
    Seaming Membrane Panels With Seam Tape
    Splicing And Seaming With Rubber To Rubber Adhesive
    Alternative Panel Layout And Seaming
    Perimeter Walls & Inside Corners
    Outside Corner Finish Detail
    Cover Strip
    Peel And Stick Pipe Boot
    Pipe Or Conduit Flashings Using Uncured Flashing With Tape
    Wall Termination
    T-Joints
    Field Seam Radical Bend
    Roof Edge Termination With Metal Drip Edge
    Terminating RUBBERALL® On Fascia
    RUBBERALL® Membrane To Shingle Transition
    One Piece Drain Sleeve
    Drains With Clamping Rings
    Pitch Pockets
    Protecting RUBBERALL® Membrane In High Foot Traffic Areas (Decks)
    Repair Of RUBBERALL® Membrane
    Application Review
    Frequently Asked Questions
    Glossary
    RUBBERALL® Roofing Membrane Material And Labor Limited Warranty
    Warranty Registration
  Installation Video Guide
 
see printer-friendly version

Laying Out RUBBERALL® EPDM Membrane

Unroll the RUBBERALL® EPDM membrane over the substrate so that the sheet is in the desired position and is wrinkle free. If more than one sheet of membrane is required always place the first sheet of membrane at the low point on the roof. Subsequent sheets would over lap the prior sheet at least 4" if using seam tape, 6" if using rubber to rubber adhesive, moving up the roof. Care should be taken to insure membrane overhangs perimeter of the roof at least three inches (3").

Figure 2

Allow the RUBBERALL® membrane to relax. Depending on weather conditions, this could take from fifteen (15) to thirty (30) minutes. Use strips of duct tape on upper edge of membrane to keep the membrane from moving.

 
 
Home About RUBBERALL Roofing Products Water Garden Products Contact Us About BRITE-N-EZ BRITE-N-EZ Roofing Products Roof Coatings Site Map